Inlet Construction commercial project site

Hampton Roads Underground Utility Contractor

Underground Utility Experts

Inlet Construction Inc. specializes in underground utility installation and infrastructure across Hampton Roads, Virginia — water, sewer, storm drain, and more.

20+

Years in Business

500+

Projects Completed

100s

Miles of Pipe Installed

98%

Client Satisfaction

Our Services

What We Do

From water main installations to complex storm drainage systems, Inlet Construction delivers safe, code-compliant underground utility work on time and on budget.

Water & Sewer Installation

Service 01

Water & Sewer Installation

We install water mains, service laterals, sanitary sewer lines, and force mains for municipal, commercial, and residential projects. Our crews are experienced with all pipe materials and trench safety requirements.

Learn More
Storm Drainage Systems

Service 02

Storm Drainage Systems

From catch basins and culverts to large-diameter storm sewer mains, we design and install drainage infrastructure that protects properties and meets Virginia DEQ and local stormwater requirements.

Learn More
Site Utilities & Earthwork

Service 03

Site Utilities & Earthwork

We handle full site utility packages including grading, excavation, underground electric conduit, gas line coordination, and site preparation — serving general contractors, developers, and municipalities.

Learn More

Portfolio

Recent Projects

A sample of the underground utility work we're proud to have completed right here in Hampton Roads.

Deep Creek

Water & Sewer

Deep Creek

Water & Sewer

Deep Creek

Deep Creek Bridge Replacement included utility relocations. The utlity work consisted of relocating of approximately 520 LF of 8-inch, 150 LF of 24-inch, and 140 LF of 6-inch watermain, installation of a 24-inch x 8-inch tapping sleeve and valve, abandonment of existing 6-inch, 8-inch, and 20-inch watermains, relocation of approximately 120 LF of 6-inch City force main, adjustment of manhole castings and valve boxes, 3 water service connections and 3 reconnections, and 2 sewer laterals, including all necessary excavation, connections, testing, backfill, compaction, and restoration.

Timberlake Shopping Center

Sewer

Timberlake Shopping Center

Sewer

Timberlake Shopping Center

Completed the installation of a new sanitary sewer system consisting of one doghouse manhole and four new precast manholes. Work included installing approximately 822 LF of 8-inch and 10-inch SDR26 sewer pipe, along with new laterals, cleanouts, manhole frames and covers, and rain-stoppers. Storm drain conflicts were encountered during installation between MH 3 and MH 5, requiring coordination for potential ductile iron pipe modifications. Upon completion, the existing sewer system will be abandoned and flowable filled.

Lincoln Ave

Sewer

Lincoln Ave

Sewer

Lincoln Ave

Completed installation, testing, and operation of the temporary bypass pumping system to maintain existing sanitary sewer flows. Cleared and stabilized access to MH 004-224, replaced the existing manhole, and performed the required sanitary sewer point repair. Completed CCTV inspections and CIPP lining of the designated gravity sewer segments, with bypass pumping adjustments made as necessary to accommodate the work.

Harbor Ln

Sewer

Harbor Ln

Sewer

Harbor Ln

Completed the installation of approximately 1,045 LF of new 8-inch SDR26 PVC sanitary sewer pipe between existing manholes along Harbor Lane and Harbor Court, including the installation of one new manhole. Work included connecting existing sewer manholes, transferring existing services to the new sewer system, and installing new 4-inch PVC laterals with cleanout assemblies at designated properties. Existing shallow sewer lines and approximately 82 LF of 6-inch cast iron sewer pipe were demolished and disposed of, along with completing designated sewer point repairs.

Wythe Creek

Water

Wythe Creek

Water

Wythe Creek

Completed a total of 56 water service taps, including one 2-inch tap and 55 3/4-inch taps. All taps were completed to provide water service connections to the designated properties.

Margate Ave

Sewer

Margate Ave

Sewer

Margate Ave

Performed the installation of approximately 885 LF of new sanitary sewer pipe, including 12-inch, 10-inch, and 8-inch PVC SDR26 pipe, along with four new concrete sanitary manholes. Work included installing new manhole frames and covers with 22-inch Rainstopper inserts and connecting the new sewer lines to the existing system. Existing sewer infrastructure was abandoned in place using flowable fill, with designated manholes demolished or partially removed and disposed of as required. Concrete alley way was replaced as removed for the installation of the new sewer main.

Our Promise

Why Hampton Roads Chooses Inlet

Licensed & Bonded

Fully licensed in Virginia with comprehensive liability, workers' comp, and contractor bonding on every project.

Local Hampton Roads Team

We live and work here. Our crews know the soil conditions, local codes, and utility authorities across the region.

Safety First

OSHA-compliant trench safety, competent persons on every excavation, and a zero-incident culture from day one.

On-Time Delivery

We set realistic schedules and hold ourselves to them. Minimizing disruption to roads, businesses, and residents is our priority.

Free Consultation

Ready to Start Your Project?

Tell us about your utility project and we'll get back to you within one business day with a free consultation.

No obligation — free project consultation
Response within one business day
Serving all of Hampton Roads

Request a Free Estimate